Warning: mkdir(): No space left on device in /www/wwwroot/NEW12.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/pinyuanlife.com/cache/40/be969/190c7.html): failed to open stream: No such file or directory in /www/wwwroot/NEW12.COM/func.php on line 115
What preparations should be made for the burner before debugging?
      1. 好色先生污污版,好色TV下载APP,好色TV污下载,好色先生软件APP

        当前位置:首页 / Product use Q&A

        What preparations should be made for the burner before debugging?

        时间:2019-01-22 点击:
        1. Check whether the installation of the burner, the installation of the flue gas butterfly valve, the installation of the combined components of the pipeline, the installation of the fan duct and the installation of the control cabinet meet the requirements.
        2. Whether the pipes (air duct and gas pipeline) are blown clean.
        3. Check whether the lines meet wiring standards (whether the power lines and signal lines are arranged separately, and whether all the wiring is covered with number pipes).
        4. Check all wiring (strong current and weak current)
        5. Whether the clean instrument air is in place (pressure adjustment 0.5bar--1bar)

        热点关注

        网站地图